When Consolidation Meets Compliance: The Burke & Alder Acquisition Story

Burke & Alder, two well-known residential-architecture firms in the Midwest, completed their acquisition in late 2022. Both had strong portfolios—Burke in mid-rise urban infill, Alder in suburban luxury—but wildly different internal processes and approaches to accessibility.

Almost immediately, the business-development team faced a triple mandate: consolidate client-project workflows, align two distinct cultures, and ensure all new work met ADA (Americans with Disabilities Act) standards. Process improvement wasn’t a buzzword. It was survival.

Challenge: Process Chaos Post-Acquisition

The weeks after closing exposed deep gaps. Burke tracked project progress with Trello and Google Sheets; Alder used a bespoke FileMaker app. Client onboarding ranged from slick digital forms to stacks of scanned PDFs. Most critically, only Alder had a structured approach to ADA requirements, while Burke relied on ad hoc reviews.

A 2024 Forrester report found that 71% of architecture firms lost project hours to duplicated processes after M&A.[^1] At Burke & Alder, the team estimated nearly 15% of their project time was wasted on reconciling double-entry data and re-checking accessibility specs missed during handoffs.

[^1]: Forrester, "Architecture Firm Process Integration After M&A," March 2024.

Six Process Improvement Strategies That Worked (And a Few That Didn’t)

1. Lean: Mapping the Full Value Stream Across Both Firms

They started with Lean tools—specifically, value stream mapping. The business-dev team pulled in project managers, junior architects, and even two lead drafters notorious for defending their “ways of doing things.”

Up on the wall: every step from initial inquiry, zoning analysis, design review, down to client handoff. They color-coded steps by which original firm handled them, and flagged touchpoints with ADA implications (ramps, door hardware, unit layouts).

Tactic: They forced themselves to count the actual number of handoffs per project. In one case, an urban multifamily design had 17 unique handoffs between roles, with three separate ADA reviews—none standardized.

Result: Reducing handoffs and standardizing ADA review at schematic and design development stages cut project cycle time by 9%.

Gotcha: Some “waste” wasn’t waste—Alder’s redundant ADA review caught two missed turning radii in the lobby plan that saved $11,000 in late-stage rework.

2. Six Sigma DMAIC: Standardizing ADA Compliance Checks

The leadership brought in a Six Sigma Black Belt (contractor, not full-time staff—a cost-control move). They applied DMAIC (Define, Measure, Analyze, Improve, Control) specifically to ADA compliance in project design.

  • Define: Where do ADA errors most occur?
  • Measure: What’s the defect rate (missed compliance) at each phase?
  • Analyze: Why are mistakes happening—knowledge gaps, unclear checklists, or bad data entry?
  • Improve: Pilot a revised checklist, flagging 12 mandatory ADA elements for multifamily.
  • Control: Add an ADA compliance review to the project-management software, with automated reminders and escalation paths.

Data: Defect rate dropped from 7.4% to 2.1% in the first six months for new projects.

Edge Case: A custom home for a wheelchair-using client required a separate ADA-plus checklist—standardization helped, but exceptions still surfaced. The playbook: flag outliers early rather than force-fitting every project.

3. Kaizen Events: Rapid Culture Melding

Process isn’t just paperwork—it’s people. Cultural misalignment showed up fast. Alder's people documented decisions in project logs; Burke’s relied on hallway conversations.

They ran three Kaizen events: two-day sprints focused on “how we make decisions.” Cross-firm teams mapped current-state, built new protocols, and agreed to test these for six weeks.

Anecdote: During the first Kaizen, a junior designer from Burke flagged a missing dimension in a bathroom plan—an Alder team lead immediately quoted the new decision protocol and suggested a change order, rather than rework after construction start. Six weeks later, change orders dropped by 23%.

Limitation: Kaizen events require psychological safety—junior voices need not just a seat, but a say. In the second event, a senior Alder principal dominated, and the outcome was less sticky.

4. Technology Consolidation: Choosing a Single Source of Truth

Nothing tanks process improvement post-M&A like mismatched tech stacks. The team staged a bake-off: Trello vs. FileMaker vs. a cloud-native project management tool (Monday.com). They scored each for:

Criteria Trello FileMaker App Monday.com
ADA Compliance Manual Custom Module Built-In Flow
Collaboration Good Poor Excellent
Reporting Limited Customizable Advanced
Integration Easy Difficult API-First
Onboarding Cost Low High Medium

They chose Monday.com, in part for its checklist automation (critical for ADA reviews) and strong API integration.

Advanced tactic: Required all project milestones to include photo evidence of completed ADA features, attached directly in Monday.com—no more “we forgot to check the ramp slope.”

Caveat: Migrating legacy projects was a pain. Historical data was messy and sometimes incomplete. The integration team spent three weeks cleaning up old project records, standardizing ADA compliance notes, and setting up fallback Excel exports for anything the API missed.

5. Continuous Feedback Loops: Survey Tools in the Field

The merged firm wanted more than one-off feedback. They built continuous loops using digital survey tools. Clients, subcontractors, and field teams received short, tailored forms after each project phase.

Tools used: Zigpoll for anonymous architect feedback (great for surfacing culture friction); SurveyMonkey for clients.

Result: In Q1 2023, the team got a 68% response rate from field crews and 42% from clients. Feedback pinpointed where ADA details (like grab bar heights and clear floor spaces) were misunderstood, prompting a new visual guide for site superintendents.

Advanced tactic: Used Zigpoll data to show that projects managed by mixed-firm teams (Burke + Alder) had fewer ADA compliance mistakes than single-origin teams—helpful for selling integration internally.

6. Agile Sprints: Rapid Iteration on Client Onboarding

Onboarding new clients exposed the legacy stack problem again. Alder’s digital forms fed directly to CRM, but Burke’s paper-heavy process was a bottleneck.

So, they ran two-week Agile sprints with a focus on onboarding, treating each sprint as a micro-project:

  • Week 1: Map both onboarding flows, shadow new clients, log pain points.
  • Week 2: Prototype a hybrid onboarding pack—part digital, part guided Zoom walkthrough.

Data point: Conversion rate from first inquiry to signed project jumped from 9% to 14% in the following quarter.

Edge Cases: Some clients—especially older homeowners—still preferred paper. They kept a parallel manual path, digitized at the back office, rather than force everyone onto digital.

Start collecting feedback in 5 minutes.Try the no-code surveys your customers actually answer — free, no credit card.
Get started free

What Didn’t Work (And Why)

Not every process improvement stuck. The team tried running a biweekly “process council” meeting to review ongoing pain points. Attendance waned after three months; team members prioritized project deadlines over internal meetings.

Their attempt to create a universal “ADA compliance playbook” failed in the custom home segment. Unique client needs and site conditions meant the standard playbook was always being rewritten.

Transferable Lessons for Mid-Level BD Pros in Architecture

  • Map processes visually—not just on paper, but with people in the room. Color coding by heritage firm reveals which steps are duplicated.
  • Standardize the essentials (like ADA checklists), but keep room for exceptions. Outliers are inevitable in custom residential work.
  • Choose a tech stack with built-in compliance features—manual tracking doesn’t scale post-acquisition.
  • Don’t skip culture integration. Kaizen events, done right, can surface critical process “gotchas” you’d otherwise miss.
  • Automate feedback loops and quantify the results. Tools like Zigpoll help surface issues faster than quarterly reviews.
  • Be pragmatic about change. Sometimes legacy processes have value—don’t eliminate them blindly.

These process improvement methodologies don’t just streamline operations—they reduce error rates, improve compliance, and, as Burke & Alder found, can boost conversion rates and client satisfaction. Real-world results: cycle times down 9%, ADA defect rates cut by two-thirds, and new-client onboarding up five points.

Not every experiment succeeded. But the right mix of Lean, Six Sigma, Kaizen, tech consolidation, feedback loops, and Agile iteration provided a path forward that you can adapt to your own post-acquisition playbook. And always—never treat ADA compliance as a checklist item. Make it a core, visible part of your process, from schematic design to field review. That’s where the difference really shows.